Source/Archive record (Unpublished document) SNT5736 - A46 Newark to Widmerpool Improvement Phase 2 Detailed Design & Construction: Report on Pressure Monitoring during the Construction of Road Embankmant at Farndon Fields (Embankment 27)
Title | A46 Newark to Widmerpool Improvement Phase 2 Detailed Design & Construction: Report on Pressure Monitoring during the Construction of Road Embankmant at Farndon Fields (Embankment 27) |
---|---|
Author/Originator | A. Copp & L. Robinson |
Date/Year | 2012 |
Abstract/Summary
This report presents the results of a pilot study to measure the impact of construction activities (the construction of a road embankment) on buried deposits and its likely effects on an assemblage of Late Upper Palaeolithic artefact bearing soils that are to be preserved in-situ.
Data gathered at the construction stage was insufficient to fully understand or adequately measure the likely impacts, but valuable data was gathered and experience gained as a result of the monitoring.
Recommendations are put forward to ensure that in the future the monitoring methodology will be more robust.
External Links (0)
Description
Results of pressure monitoring. Report includes locaitn of pressure pad stations and pressure monitoring measurements
Location
Referenced Monuments (0)
Referenced Events (1)
- ENT5079 Pressure Monitoring at Farndon Roundabout